



Automatic carrier equipment made by our company is installed in a painting factory, and I'm contributing to operational efficiency.
| 1 | Move from a drying room to the front. |
|---|---|
| 2 | Move on the main rail to the side. |
| 3 | Stop. |
| 4 | Move to the front. |
copyright ©EBA KOGYO All Rights Reserved.